This PEB structure is built on an incline and has been divided into different bay heights with step orientation. This is a multi Span – 1 PEB Structure with a span of 2 x 20m. The PEB Structure has a mezzanine floor and an EOT Crane with a maximum clear height of 12m. The project is expected to be completed by October 2022.