This PEB structure was completed in the year 2016. This PEB Structure is the plant for a wire pickling and wire drawing manufacturer. Spread over an area of more than 125000 sq. Ft, this PEB structure has a clear span of 30m. The PEB structure has an EOT Crane of 15MT and a roof monitor along the entire length of the plant.