![Industrial Shed - PEB 3 Edit DJI 0239 1](https://bajajpeb.com/wp-content/uploads/2022/08/Edit-DJI_0239-1-1024x1024.jpg)
This PEB structure is built on an incline and has been divided into different bay heights with step orientation. This is a multi Span – 1 PEB Structure with a span of 2 x 20m. The PEB Structure has a mezzanine floor and an EOT Crane with a maximum clear height of 12m. The project is expected to be completed by October 2022.